Decision in paragraph 105 in UNEP/OzL.Pro/ExCom/11/36

November 1993
Indonesia
World Bank
Projects approved / deferred / transferred

Project proposals:  Indonesia

105.  The Executive Committee approved the following six projects for implementation by the World Bank, subject to the Secretariat's comments as noted in document UNEP/OzL.Pro/ExCom11/26 and Corr.1 and on condition that low pressure equipment which would be replaced should be destroyed where applicable: 

          (i) Elimination of CFC-11/12 by the Tulus Company in the manufacture of extruded polyethylene and polystyrene foam sheet: US $416,000; 

          (ii) Elimination of CFC-12 by the Intitri Muliatama Company in the manufacture of extruded polyethylene and polystyrene foam sheet: US $387,000; 

          (iii) Elimination of CFC-11 by the Dasa Windu Agung Company in the manufacture of polyurethane foams: US $1,733,000; 

          (iv) Elimination of CFC-11 by the Foamindo Industri Uretan Company in the manufacture of flexible polyurethane foam: US $176,000;

          (v) Technical assistance programme for small CFC users in the flexible polyurethane foam sector: US $1.6 million; (vi) Safety and technical programme to assist manufacturers of hydrocarbon-propelled aerosol products: US $238,000.