Decision 63/39

April 2011
Cook Islands | Kiribati | Mali | Micronesia (Federated States of) | Nauru | Niue | Palau | Samoa | Solomon Islands | Tonga | Tuvalu | Vanuatu
UNEP
Projects approved / deferred / transferred

The Executive Committee decided:

  1. To approve, in principle, stage I of the HCFC phase-out management plan (HPMP) for the Pacific Island Countries (PICs) for the period 2011 to 2020, at the amount of US $1,696,000, plus agency support costs of US $220,480 for UNEP, with the individual amounts approved for each country listed in Annex X to the present report;
  2. To note that each of the Governments of the PICs had agreed to establish individual estimated baselines as their starting points for sustained aggregate reduction in HCFC consumption calculated using actual consumption reported for 2009 and estimated consumption for 2010, with a total aggregate baseline of 3.25 ODP tonnes (59.11 metric tonnes), as indicated below:
Country2009 actual consumption (mt)

2010

estimated consumption (mt)

Estimated baseline
Metric tonnes

ODP

tonnes

Cook Islands (the)0.5701.8201.1950.066
Kiribati0.6802.1901.4350.079
Marshall Islands (the)3.4804.5003.9900.219

Micronesia (Federated

States of)

1.6403.0002.3200.128
Nauru0.1000.5000.3000.017
Niue-0.3000.1500.008
Palau2.0403.8802.9600.163
Samoa3.5004.2603.8800.213
Solomon Islands28.28041.00034.6401.905
Tonga0.0102.6701.3400.074
Tuvalu1.5901.6201.6050.088
Vanuatu1.4609.1005.2800.290
  1. To approve the draft Agreement* between the Governments of the PICs and the Executive Committee for the reduction in consumption of HCFCs, as contained in Annex XXI to the present report;
  2. To request the Fund Secretariat, once the countries’ baseline data were known, to update Appendix 2-A to the Agreement to include the figures for maximum allowable consumption, and to notify the Executive Committee of the resulting change in the levels of maximum allowable consumption and of any potential related impact on the eligible funding levels, with any adjustments needed being made when the next tranches were submitted; and
  3. To approve the first tranche of stage I of the HPMP for the PICs, and the corresponding implementation plan, at the amount of US $873,375, plus agency support costs of US $113,539 for UNEP.
Related annexes
Annex X to document 63/60, projects and activities approved