The Executive Committee decided:
- To approve, in principle, stage I of the HCFC phase-out management plan (HPMP) for Ecuador for the period 2011 to 2020 to meet the 35 per cent reduction in HCFC consumption, at the amount of US $2,114,873, consisting of US $1,846,440, plus agency support costs of US $138,483 for UNIDO, and US $115,000, plus agency support costs of US $14,950 for UNEP, on the understanding that:
- US $630,000 were provided to address HCFC consumption in the refrigeration servicing sector to reach up to and include the 35 per cent reduction in 2020 in line with decision 60/44; and
- US $1,331,440 were provided for the investment component for the phase-out of 14.96 ODP tonnes of HCFC-141b contained in imported pre-blended polyols used in the foam manufacturing sector;
- To note that the Government of Ecuador had agreed to establish as its starting point for sustained aggregate reduction in HCFC consumption an estimated baseline of 17.49 ODP tonnes, calculated using actual consumption of 20.65 ODP tonnes and 14.32 ODP tonnes reported for 2009 and 2010, respectively, under Article 7 of the Montreal Protocol, plus 20.67 ODP tonnes of HCFC-141b contained in imported pre‑blended polyol systems, resulting in 38.16 ODP tonnes;
- To deduct 21.08 ODP tonnes of HCFCs from the starting point for sustained aggregate reduction in HCFC consumption;
- To approve the draft Agreement* between the Government of Ecuador and the Executive Committee for the reduction in consumption of HCFCs, as contained in Annex XII to the present report;
- To request the Fund Secretariat, once the baseline data were known, to update Appendix 2-A to the Agreement to include the figures for maximum allowable consumption, and to notify the Executive Committee of the resulting change in the levels of maximum allowable consumption and of any potential related impact on the eligible funding level, with any adjustments needed being made when the next tranche was submitted;
- To approve the first tranche of stage I of the HPMP for Ecuador, and the corresponding implementation plan, at the amount of US $1,680,736, consisting of US $1,531,940, plus agency support costs of US $114,896 for UNIDO, and US $30,000, plus agency support costs of US $3,900 for UNEP; and
- That funding would be disbursed only upon receipt by the Secretariat of confirmation that an adequate and operational licensing system was in place.
- This Agreement was revised as per Decision 70/15