Decision 66/34

April 2012
Bosnia and Herzegovina
UNIDO
Projects approved / deferred / transferred

Following consultations in an informal contact group, the Executive Committee decided:

  1. To approve, in principle, stage I of the HCFC phase-out management plan (HPMP) for Bosnia and Herzegovina for the period 2012 to 2020 to reduce HCFC consumption by 35 per cent of the baseline, at the amount of US $953,284, plus agency support costs of US $71,496 for UNIDO, on the understanding that:
    1. US $280,000 were provided to address HCFC consumption in the refrigeration servicing sector to reach up to and include the 35 per cent reduction in 2020 in line with decision 60/44; and
    2. US $673,284 were provided for the investment component and the associated technical assistance component for the phase-out of 5.76 ODP tonnes of HCFCs used in the polyurethane foam and commercial refrigeration manufacturing sectors;
  2. To note that the Government of Bosnia and Herzegovina had agreed to establish as its starting point for sustained aggregate reduction in HCFC consumption the baseline of 4.7 ODP tonnes, calculated using actual consumption of 5.7 ODP tonnes and 3.5 ODP tonnes reported for 2009 and 2010, respectively, under Article 7 of the Montreal Protocol, plus 3.47 ODP tonnes of HCFC-141b contained in imported pre‑blended polyol systems, resulting in 8.17 ODP tonnes;
  3. To note the commitment of the Government of Bosnia and Herzegovina to ban imports of HCFC-141b, both pure and contained in pre-blended polyols, no later than 1 January 2016;
  4. To deduct 6.58 ODP tonnes of HCFCs from the starting point for sustained aggregate reduction in HCFC consumption;
  5. To approve the draft Agreement between the Government of Bosnia and Herzegovina and the Executive Committee for the reduction in consumption of HCFCs, as contained in Annex XVI to the present report; and
  6. To approve the first tranche of stage I of the HPMP for Bosnia and Herzegovina, and the corresponding implementation plan, at the amount of US $631,282, plus agency support costs of US $47,346 for UNIDO.
Related annexes
Annex XVI to docucment 66/54, HPMP stage I agreement with Bosnia and Herzegovina