The Executive Committee decided:
- To note the verification report on the HCFC production sector for China, considered by the Sub-group on the Production Sector, which indicated that China had remained within the maximum allowable production and consumption targets for 2014;
- To request the World Bank and the Government of China to examine the differences between the customs data and the data reported by the following producers: Zhejiang Yongpeng, Zhejiang Sanmei, Zhejiang Juhua and Zibo Luxuan, and to report back to the Executive Committee in the 2015 verification report to be conducted in 2016; and
- To allow consideration of the funding tranche of the 2016 annual implementation programme of stage I of the HCFC production phase-out management plan for China at the 75th meeting.