Decision 83/29

May 2019
Egypt
UNDP
Projects with specific reporting requirements

The Executive Committee decided:

  1. To note the preliminary final report on the demonstration of low-cost options for the conversion to non-ODS technologies in the polyurethane foam sector at very small users in Egypt, submitted by UNDP and contained in document UNEP/OzL.Pro/ExCom/83/11;
  2. To extend, on an exceptional basis, noting the substantial progress achieved so far, the completion date of the project referred to in sub-paragraph (a) above, to 31 July 2019, on the understanding that no further extension of project implementation would be requested; and
  3. To request UNDP to submit the final report of the project referred to in sub‑paragraph (a) above, no later than the 84th meeting, noting that it would include details of the comparison of the specifications of the original equipment with those of the optimized low-cost units, the performance of the equipment during testing, including the foam systems used during the testing, the results of using the new equipment and recommendations regarding its utility for very small users.