66. The Executive Committee considered the recommendations of the Sub-Committee on Project Review and approved the following amendments to the 1994 UNIDO Work Programme contained in document UNEP/OzL.Pro/ExCom/15/14 for a total amount of US $832,923, including US $95,823 as support costs for UNIDO:
| Country | Project | Approved amount (US $) |
| Algeria | Preparation of an investment project for the phase out of CFC-11 in the manufacture of sandwich panels at Prosider (Annaba-Algeria) | 25,000 |
| Project formulation of establishment of a National Centre for Recovery and Recycling of CFC-11, CFC-12 and CFC-502 | 25,000 | |
| Preparation of an investment project for CFC phase out in the production of rigid foam at Batimetal | 25,000 | |
| Barbados | Preparation of project for retrofitting in all ice-making systems, ice bin compressor systems, blast freezers, cold storage and chiller rooms | 10,000 |
| Cameroon | Preparation of a project for phasing out CFC-11 in the manufacture of domestic refrigerators, freezers and air-conditioners at Union Camerounaise | 25,000 |
| China | Preparation of investment project for phase-out of CFC-11 and CFC-12 at a domestic refrigerator plant at Xiling | 25,000 |
| Indonesia | Project formulation for phasing out ODS in small and medium-scale industries | 80,000 |
| Iran | Preparation of investment projects for the phase out of CFC-11 and CFC-12 in the domestic refrigeration industry | 50,000 |
| Jordan | Preparatory assistance for investment projects in commercial refrigeration, air conditioning, foam and halon sectors | 50,000 |
| Macedonia | Country programme preparation | 80,000 |
| Mozambique | Preparation of projects in commercial refrigeration | 15,000 |
| Romania | Preparation of investment project for phase out of CFC-11 and CFC-12 at a domestic refrigerator plant at Mechanical Enterprise Sadu and Arctic | 50,000 |
| Seychelles | Preparation of a project proposal for setting up a National Refrigerant Recovery and Recycling Centre, National Halon Bank and Regional Centre for Refrigeration Technicians and Engineers | 15,000 |
| Swaziland | Preparatory assistance for the formulation of a project in a domestic refrigerator plant (Fridgemaster) | 25,000 |
| Syria | Preparation of investment projects for phasing out of CFC in manufacturing of refrigerators at Krayem Int. Co. | 15,000 |
| Preparation of investment projects for phasing out of CFC-11 from the manufacturing of pre-fabricated sandwich panels at Krayem Cold Stores | 15,000 | |
| Preparation of investment projects for phasing out of CFC-11 from the sub-sector of flexible foams manufacturing | 20,000 | |
| Tanzania | Preparation of investment project in the refrigeration sector at Daikin Air Conditioning Ltd. | 10,000 |
| Preparation of investment project in the aerosol sector at Mansoor Daya Chemical Ltd. | 10,000 | |
| Turkey | Preparation of investment projects on ODS phase out in the foam sector | 50,000 |
| Viet Nam | Preparation of investment project for reduction of refrigerant emissions and establishment of a collection and reclaiming network in the domestic refrigeration service sector | 15,000 |
| Preparation of investment project for reduction of refrigerant emissions and conversion of food processing and other industrial refrigeration and A/C equipment to suitable alternatives | 20,000 | |
| Zambia | Training and certification programmes for refrigeration technicians and preparation of investment projects for the refrigeration sector | 82,100 |
| Subtotal | 737,100 | |
| 13% support costs | 95,823 | |
| Total | 832,923 |