Decision in paragraph 75 in UNEP/OzL.Pro/ExCom/13/47

July 1994
Argentina | Brazil | China | India | Indonesia | Thailand | Türkiye
World Bank
Projects approved / deferred / transferred

75.    The Committee considered the recommendations of the Sub-Committee on Project Review and approved the following amendments to the 1994 World Bank work programme for an amount of US $2,520,960.

CountryProject

Approved Amount US$

ArgentinaInstitutional strengthening

399,500

BrazilSystem for storage and charging of ester oils used in manufacture of HFC-134a refrigerant refrigerator compressors at Empresa Brasileira de Compressors (EMBRACO)

221,2001

ChinaConversion to CFC-free technology in manufacture of extruded polyethylene and polystyrene foam sheet at Shanghai No.18 Plastics Product Plant

450,000

 Fire extinguisher product conversion from Halon 1211 to ABC dry chemical at Benxi Fire Equipment Factory, Liaoning

0

 The Committee agreed that loss of profit is not considered an eligible operating incremental cost. It further decided to defer approval of the project until operating savings are calculated and taken into account when determining the grant amount for the above-mentioned project. 
IndiaConversion of CFC-12 open-type compressor designs for use of HCFC-22 refrigerant at Freezeking Industries Pvt. Ltd.

240,500

IndonesiaElimination of CFC-11 in the manufacture of flexible polyurethane foam (slabstock) at P.T. Erlangga Trimanunggal Kusamah

379,000

 Elimination of CFC-11 in the manufacture of flexible polyurethane foam (slabstock) at P.T. Royal Abadi Sejahtera

237,500

 ODS phase-out investment project preparation

170,000

ThailandProduction of HFC-134a mobile air-conditioner parts at Nippondenso

141,500

 The Committee decided that the utilization of CFC-12 equipment for production of spare parts should be checked at the appraisal stage. If the CFC-12 equipment is used for production of CFC-12 spare parts the cost of this equipment should be evaluated and the grant amount should be adjusted accordingly. The Executive Committee should be reported to on this matter.

 

 Conversion of Electronic Cleaning Process from CFC-113 to High-Purity Water Cleaning at Team Tronics Co., Ltd.

221,760

 The Executive Committee requested the World Bank to calculate incremental operating costs (savings) taking into account the comments by the Secretariat at the appraisal stage and to report back to the Executive Committee.

 

TurkeyODS phase-out investment project preparation 

100,000

 Total Project Costs:

 2,520,960

 

1 See paragraph 82 [of document UNEP/OzL.Pro/ExCom/13/47]